Estimate electrical frequency from clock shift












2















About 6 months ago I installed a solar power system with 2 Tesla Powerwalls for backup. Today, we got to test out the system with a power outage from an ice store in the southeast (still on battery power as I write this)



My kids came downstairs to tell me that I was time for bed (9PM), but when I looked at my phone, it was only 8:17PM. They were reading the time off the microwave. I checked the alarm clock in my room and it also read 9PM



I know that the way power is "pushed" around between solar, utility, and the Powerwall is by modifying the frequency of the ac signal. I also know that many digital clocks keep time via utility frequency.



So, my question is this - if our power went out at roughly 10AM, and by 9PM our digital clocks were off by almost 45 minutes, what frequency is the powerwall delivering backup power at? That large of a shift in time seems excessive (purely speculative).










share|improve this question







New contributor




Matt is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.





















  • If the powerwall has line voltage outputs they should be set to line frequency. What does the powerwall specification/nameplate say? Are you 100% certain that the clocks didn't simply reset during the momentary dropout before the UPS/PTS kicked in?

    – K H
    2 hours ago











  • It maybe skipped pulses from switching between power sources. They all may have accurate 60 HZ +/- 0.1 % timing, but it can take several milliseconds to switch power sources. Most manufactures guarantee to switch in 10 mS or less, but even that is a 1 count error. That and built in errors on some equipment can easily add up to 45 minutes in 11 hours.

    – Sparky256
    2 hours ago
















2















About 6 months ago I installed a solar power system with 2 Tesla Powerwalls for backup. Today, we got to test out the system with a power outage from an ice store in the southeast (still on battery power as I write this)



My kids came downstairs to tell me that I was time for bed (9PM), but when I looked at my phone, it was only 8:17PM. They were reading the time off the microwave. I checked the alarm clock in my room and it also read 9PM



I know that the way power is "pushed" around between solar, utility, and the Powerwall is by modifying the frequency of the ac signal. I also know that many digital clocks keep time via utility frequency.



So, my question is this - if our power went out at roughly 10AM, and by 9PM our digital clocks were off by almost 45 minutes, what frequency is the powerwall delivering backup power at? That large of a shift in time seems excessive (purely speculative).










share|improve this question







New contributor




Matt is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.





















  • If the powerwall has line voltage outputs they should be set to line frequency. What does the powerwall specification/nameplate say? Are you 100% certain that the clocks didn't simply reset during the momentary dropout before the UPS/PTS kicked in?

    – K H
    2 hours ago











  • It maybe skipped pulses from switching between power sources. They all may have accurate 60 HZ +/- 0.1 % timing, but it can take several milliseconds to switch power sources. Most manufactures guarantee to switch in 10 mS or less, but even that is a 1 count error. That and built in errors on some equipment can easily add up to 45 minutes in 11 hours.

    – Sparky256
    2 hours ago














2












2








2








About 6 months ago I installed a solar power system with 2 Tesla Powerwalls for backup. Today, we got to test out the system with a power outage from an ice store in the southeast (still on battery power as I write this)



My kids came downstairs to tell me that I was time for bed (9PM), but when I looked at my phone, it was only 8:17PM. They were reading the time off the microwave. I checked the alarm clock in my room and it also read 9PM



I know that the way power is "pushed" around between solar, utility, and the Powerwall is by modifying the frequency of the ac signal. I also know that many digital clocks keep time via utility frequency.



So, my question is this - if our power went out at roughly 10AM, and by 9PM our digital clocks were off by almost 45 minutes, what frequency is the powerwall delivering backup power at? That large of a shift in time seems excessive (purely speculative).










share|improve this question







New contributor




Matt is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.












About 6 months ago I installed a solar power system with 2 Tesla Powerwalls for backup. Today, we got to test out the system with a power outage from an ice store in the southeast (still on battery power as I write this)



My kids came downstairs to tell me that I was time for bed (9PM), but when I looked at my phone, it was only 8:17PM. They were reading the time off the microwave. I checked the alarm clock in my room and it also read 9PM



I know that the way power is "pushed" around between solar, utility, and the Powerwall is by modifying the frequency of the ac signal. I also know that many digital clocks keep time via utility frequency.



So, my question is this - if our power went out at roughly 10AM, and by 9PM our digital clocks were off by almost 45 minutes, what frequency is the powerwall delivering backup power at? That large of a shift in time seems excessive (purely speculative).







frequency clock






share|improve this question







New contributor




Matt is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.











share|improve this question







New contributor




Matt is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.









share|improve this question




share|improve this question






New contributor




Matt is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.









asked 2 hours ago









Matt Matt

111




111




New contributor




Matt is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.





New contributor





Matt is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.






Matt is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.













  • If the powerwall has line voltage outputs they should be set to line frequency. What does the powerwall specification/nameplate say? Are you 100% certain that the clocks didn't simply reset during the momentary dropout before the UPS/PTS kicked in?

    – K H
    2 hours ago











  • It maybe skipped pulses from switching between power sources. They all may have accurate 60 HZ +/- 0.1 % timing, but it can take several milliseconds to switch power sources. Most manufactures guarantee to switch in 10 mS or less, but even that is a 1 count error. That and built in errors on some equipment can easily add up to 45 minutes in 11 hours.

    – Sparky256
    2 hours ago



















  • If the powerwall has line voltage outputs they should be set to line frequency. What does the powerwall specification/nameplate say? Are you 100% certain that the clocks didn't simply reset during the momentary dropout before the UPS/PTS kicked in?

    – K H
    2 hours ago











  • It maybe skipped pulses from switching between power sources. They all may have accurate 60 HZ +/- 0.1 % timing, but it can take several milliseconds to switch power sources. Most manufactures guarantee to switch in 10 mS or less, but even that is a 1 count error. That and built in errors on some equipment can easily add up to 45 minutes in 11 hours.

    – Sparky256
    2 hours ago

















If the powerwall has line voltage outputs they should be set to line frequency. What does the powerwall specification/nameplate say? Are you 100% certain that the clocks didn't simply reset during the momentary dropout before the UPS/PTS kicked in?

– K H
2 hours ago





If the powerwall has line voltage outputs they should be set to line frequency. What does the powerwall specification/nameplate say? Are you 100% certain that the clocks didn't simply reset during the momentary dropout before the UPS/PTS kicked in?

– K H
2 hours ago













It maybe skipped pulses from switching between power sources. They all may have accurate 60 HZ +/- 0.1 % timing, but it can take several milliseconds to switch power sources. Most manufactures guarantee to switch in 10 mS or less, but even that is a 1 count error. That and built in errors on some equipment can easily add up to 45 minutes in 11 hours.

– Sparky256
2 hours ago





It maybe skipped pulses from switching between power sources. They all may have accurate 60 HZ +/- 0.1 % timing, but it can take several milliseconds to switch power sources. Most manufactures guarantee to switch in 10 mS or less, but even that is a 1 count error. That and built in errors on some equipment can easily add up to 45 minutes in 11 hours.

– Sparky256
2 hours ago










2 Answers
2






active

oldest

votes


















2














45 minutes over a span of 660 minutes is an error of 6.8%. That's rather high. I would have expected a crystal-controlled frequency with an error of 100 ppm or less — i.e., less than 4 seconds over 11 hours.



And power isn't "pushed" by modifying the frequency per se, but rather the relative phase of the various sources.






share|improve this answer































    0














    Units such as APC and Trip-Lite UPS detect 60+/-3 Hz as a power good and either reduce AC load outside this frequency or switch off AC charge to rely on battery backup. They also use voltage thresholds.



    However these UPS units have a relatively short backup time compared to the PowerWall2 (PW2) . There are UPS's with +/-6Hz tolerance for input power detection such as the Minuteman.



    Therefore to reduce non-essential loads that have short-term backup such as UPS, the PW2 runs > 65 HZ intentionally. or > 7.7% fast.



    Your clocks were reading (21:00-10:00) * 60min/h = 660 minutes when you were expecting (20:17-10:00) * 60min/h = 617 min or 43 minutes fast = 43/617*100% = 7.0% fast which was the actual increase on the PW2 or 64.2 Hz.



    The PW2 was 10% within the 65 Hz that I expected, but I do not have their actual specifications.



    I am aware of this but cannot prove it.






    share|improve this answer























      Your Answer





      StackExchange.ifUsing("editor", function () {
      return StackExchange.using("mathjaxEditing", function () {
      StackExchange.MarkdownEditor.creationCallbacks.add(function (editor, postfix) {
      StackExchange.mathjaxEditing.prepareWmdForMathJax(editor, postfix, [["\$", "\$"]]);
      });
      });
      }, "mathjax-editing");

      StackExchange.ifUsing("editor", function () {
      return StackExchange.using("schematics", function () {
      StackExchange.schematics.init();
      });
      }, "cicuitlab");

      StackExchange.ready(function() {
      var channelOptions = {
      tags: "".split(" "),
      id: "135"
      };
      initTagRenderer("".split(" "), "".split(" "), channelOptions);

      StackExchange.using("externalEditor", function() {
      // Have to fire editor after snippets, if snippets enabled
      if (StackExchange.settings.snippets.snippetsEnabled) {
      StackExchange.using("snippets", function() {
      createEditor();
      });
      }
      else {
      createEditor();
      }
      });

      function createEditor() {
      StackExchange.prepareEditor({
      heartbeatType: 'answer',
      autoActivateHeartbeat: false,
      convertImagesToLinks: false,
      noModals: true,
      showLowRepImageUploadWarning: true,
      reputationToPostImages: null,
      bindNavPrevention: true,
      postfix: "",
      imageUploader: {
      brandingHtml: "Powered by u003ca class="icon-imgur-white" href="https://imgur.com/"u003eu003c/au003e",
      contentPolicyHtml: "User contributions licensed under u003ca href="https://creativecommons.org/licenses/by-sa/3.0/"u003ecc by-sa 3.0 with attribution requiredu003c/au003e u003ca href="https://stackoverflow.com/legal/content-policy"u003e(content policy)u003c/au003e",
      allowUrls: true
      },
      onDemand: true,
      discardSelector: ".discard-answer"
      ,immediatelyShowMarkdownHelp:true
      });


      }
      });






      Matt is a new contributor. Be nice, and check out our Code of Conduct.










      draft saved

      draft discarded


















      StackExchange.ready(
      function () {
      StackExchange.openid.initPostLogin('.new-post-login', 'https%3a%2f%2felectronics.stackexchange.com%2fquestions%2f416828%2festimate-electrical-frequency-from-clock-shift%23new-answer', 'question_page');
      }
      );

      Post as a guest















      Required, but never shown

























      2 Answers
      2






      active

      oldest

      votes








      2 Answers
      2






      active

      oldest

      votes









      active

      oldest

      votes






      active

      oldest

      votes









      2














      45 minutes over a span of 660 minutes is an error of 6.8%. That's rather high. I would have expected a crystal-controlled frequency with an error of 100 ppm or less — i.e., less than 4 seconds over 11 hours.



      And power isn't "pushed" by modifying the frequency per se, but rather the relative phase of the various sources.






      share|improve this answer




























        2














        45 minutes over a span of 660 minutes is an error of 6.8%. That's rather high. I would have expected a crystal-controlled frequency with an error of 100 ppm or less — i.e., less than 4 seconds over 11 hours.



        And power isn't "pushed" by modifying the frequency per se, but rather the relative phase of the various sources.






        share|improve this answer


























          2












          2








          2







          45 minutes over a span of 660 minutes is an error of 6.8%. That's rather high. I would have expected a crystal-controlled frequency with an error of 100 ppm or less — i.e., less than 4 seconds over 11 hours.



          And power isn't "pushed" by modifying the frequency per se, but rather the relative phase of the various sources.






          share|improve this answer













          45 minutes over a span of 660 minutes is an error of 6.8%. That's rather high. I would have expected a crystal-controlled frequency with an error of 100 ppm or less — i.e., less than 4 seconds over 11 hours.



          And power isn't "pushed" by modifying the frequency per se, but rather the relative phase of the various sources.







          share|improve this answer












          share|improve this answer



          share|improve this answer










          answered 2 hours ago









          Dave TweedDave Tweed

          118k9145256




          118k9145256

























              0














              Units such as APC and Trip-Lite UPS detect 60+/-3 Hz as a power good and either reduce AC load outside this frequency or switch off AC charge to rely on battery backup. They also use voltage thresholds.



              However these UPS units have a relatively short backup time compared to the PowerWall2 (PW2) . There are UPS's with +/-6Hz tolerance for input power detection such as the Minuteman.



              Therefore to reduce non-essential loads that have short-term backup such as UPS, the PW2 runs > 65 HZ intentionally. or > 7.7% fast.



              Your clocks were reading (21:00-10:00) * 60min/h = 660 minutes when you were expecting (20:17-10:00) * 60min/h = 617 min or 43 minutes fast = 43/617*100% = 7.0% fast which was the actual increase on the PW2 or 64.2 Hz.



              The PW2 was 10% within the 65 Hz that I expected, but I do not have their actual specifications.



              I am aware of this but cannot prove it.






              share|improve this answer




























                0














                Units such as APC and Trip-Lite UPS detect 60+/-3 Hz as a power good and either reduce AC load outside this frequency or switch off AC charge to rely on battery backup. They also use voltage thresholds.



                However these UPS units have a relatively short backup time compared to the PowerWall2 (PW2) . There are UPS's with +/-6Hz tolerance for input power detection such as the Minuteman.



                Therefore to reduce non-essential loads that have short-term backup such as UPS, the PW2 runs > 65 HZ intentionally. or > 7.7% fast.



                Your clocks were reading (21:00-10:00) * 60min/h = 660 minutes when you were expecting (20:17-10:00) * 60min/h = 617 min or 43 minutes fast = 43/617*100% = 7.0% fast which was the actual increase on the PW2 or 64.2 Hz.



                The PW2 was 10% within the 65 Hz that I expected, but I do not have their actual specifications.



                I am aware of this but cannot prove it.






                share|improve this answer


























                  0












                  0








                  0







                  Units such as APC and Trip-Lite UPS detect 60+/-3 Hz as a power good and either reduce AC load outside this frequency or switch off AC charge to rely on battery backup. They also use voltage thresholds.



                  However these UPS units have a relatively short backup time compared to the PowerWall2 (PW2) . There are UPS's with +/-6Hz tolerance for input power detection such as the Minuteman.



                  Therefore to reduce non-essential loads that have short-term backup such as UPS, the PW2 runs > 65 HZ intentionally. or > 7.7% fast.



                  Your clocks were reading (21:00-10:00) * 60min/h = 660 minutes when you were expecting (20:17-10:00) * 60min/h = 617 min or 43 minutes fast = 43/617*100% = 7.0% fast which was the actual increase on the PW2 or 64.2 Hz.



                  The PW2 was 10% within the 65 Hz that I expected, but I do not have their actual specifications.



                  I am aware of this but cannot prove it.






                  share|improve this answer













                  Units such as APC and Trip-Lite UPS detect 60+/-3 Hz as a power good and either reduce AC load outside this frequency or switch off AC charge to rely on battery backup. They also use voltage thresholds.



                  However these UPS units have a relatively short backup time compared to the PowerWall2 (PW2) . There are UPS's with +/-6Hz tolerance for input power detection such as the Minuteman.



                  Therefore to reduce non-essential loads that have short-term backup such as UPS, the PW2 runs > 65 HZ intentionally. or > 7.7% fast.



                  Your clocks were reading (21:00-10:00) * 60min/h = 660 minutes when you were expecting (20:17-10:00) * 60min/h = 617 min or 43 minutes fast = 43/617*100% = 7.0% fast which was the actual increase on the PW2 or 64.2 Hz.



                  The PW2 was 10% within the 65 Hz that I expected, but I do not have their actual specifications.



                  I am aware of this but cannot prove it.







                  share|improve this answer












                  share|improve this answer



                  share|improve this answer










                  answered 2 hours ago









                  Sunnyskyguy EE75Sunnyskyguy EE75

                  63.4k22194




                  63.4k22194






















                      Matt is a new contributor. Be nice, and check out our Code of Conduct.










                      draft saved

                      draft discarded


















                      Matt is a new contributor. Be nice, and check out our Code of Conduct.













                      Matt is a new contributor. Be nice, and check out our Code of Conduct.












                      Matt is a new contributor. Be nice, and check out our Code of Conduct.
















                      Thanks for contributing an answer to Electrical Engineering Stack Exchange!


                      • Please be sure to answer the question. Provide details and share your research!

                      But avoid



                      • Asking for help, clarification, or responding to other answers.

                      • Making statements based on opinion; back them up with references or personal experience.


                      Use MathJax to format equations. MathJax reference.


                      To learn more, see our tips on writing great answers.




                      draft saved


                      draft discarded














                      StackExchange.ready(
                      function () {
                      StackExchange.openid.initPostLogin('.new-post-login', 'https%3a%2f%2felectronics.stackexchange.com%2fquestions%2f416828%2festimate-electrical-frequency-from-clock-shift%23new-answer', 'question_page');
                      }
                      );

                      Post as a guest















                      Required, but never shown





















































                      Required, but never shown














                      Required, but never shown












                      Required, but never shown







                      Required, but never shown

































                      Required, but never shown














                      Required, but never shown












                      Required, but never shown







                      Required, but never shown







                      Popular posts from this blog

                      Fluorita

                      Hulsita

                      Península de Txukotka